Bubble Point’s highly specialized production testing equipment are designed to withstand the abrasive conditions in which we operate. All our equipment are built to meet ASME (American Society of Mechanical Engineers) standards, and all our flow lines meet the API (American Petroleum Institute) 6-A standard. The vessels on each piece of equipment undergo a rigorous heat treatment and stress relief process to ensure they are structurally sound and able to withstand the rigors and pressures associated with producing wells.
Our Well Testing, Drilling Support and Oil Delivery Pump spread include:
- 30” x 10’ 1,44Opsi MWP Skid Mounted Test Separator
- 10,000-psi Surface Safety Valve
- Emergency Shut Down Control Panel c/w shut down Stations
- 10,000-Psi Data Header
- Fig. 1502 Pipes and Elbows
- Fig 602 Pipes and Elbows
- 100 Barrel, 250-psi MWP, Dual Compartment Surge Tank
- Ranarex Gas Gravitometer
- Portable Well Test Lab
- Drill Pipe Pup Joints — PH-6 and CS Hydril
- Electric Motor Driven Centrifugal Pumps
- Diesel Engine Driven Centrifugal Pumps
- Mud Skips
- 500 Barrel Flow Back Atmospheric Tanks
- 15.Coflexip Hose — 10,000-psi MWP, 60-ft
- 16.Air Compressors — 750 cfm/250-psi
Skid Mounted Test Separator
Bubble Point Skid Mounted Test Separator —1440- PSI MWP
A well test operation is the measurement, under controlled conditions, of all factors relating to the production of oil, gas and water from a well. Acquired well test data is used to determine reservoir capabilities. Important decisions, such as production methods, well production improvement, and developmental drilling are made from this information. Regulatory bodies may use the test results to
establish withdrawal allocation and tax basis. Well testers like Bubble Point have a responsibility to provide complete and accurate data of the reservoir performance and evaluation. Since the primary purpose of well testing is to gather reservoir information, well test equipment provides the means to obtain essential data such as:
- Pressures
- Temperatures
- Production Volumes
- Gas, Oil and Water Rates
- Samples of Produced Fluids
fig 1502 & fig 602 Pipes
Surface Well Testing fig 1502 & fig 602 Pipes
Surface well test equipment provides well control, well effluent processing, disposal and analysis. The exact combination of the equipment necessary to achieve these goals ¡s dependent upon well conditions and test requirements.